Ultrafast Broadband Install Guide
This guide explains what happens after you order Ultrafast Broadband (Full Fibre) and what to expect during installation and activation.
1. Order confirmation
After you place your order, you will receive a confirmation email showing:
- Your chosen package and speed
- Contract length and monthly cost
- Next steps
We automatically check which network serves your address (Openreach, CityFibre, OFNL, Zen, or Vfast GPON).
2. Pre-installation checks
The network serving your address determines:
- Typical lead times
- Whether an engineer visit is required
- How activation will take place
If your property already has fibre equipment installed (for example, from a previous occupant or as part of a new build):
- We will check if an existing installation can be reused
- You can tell us in the order form notes
- This may allow faster activation or remove the need for an engineer visit
We will confirm whether an engineer visit is required or whether your service can be activated remotely.
Typical lead times
Installation times vary by network and local availability.
As a general guide:
- Some properties can be activated within a few working days
- New fibre installations usually take 1–4 weeks
- Complex installations or blocked ducting can take longer
We will confirm your expected timescale after your order is placed.
3. Engineer visit (if required)
If installation is needed:
- You will be contacted to confirm the appointment date and time
- Someone aged 18 or over must be present
- Access to the installation area must be available
- Any required permissions must be in place
An engineer from the network provider (or a Vfast engineer for PIA areas) will install and activate the fibre connection.
Drilling and internal work
- Small holes may be drilled to bring the fibre cable into your property
- Equipment will be fixed to walls where required
- Where possible, existing entry points will be used
Equipment location
- The engineer will agree the location of the fibre box (ONT) with you on the day
- The location must be close to a power socket and suitable for cabling
If installation cannot be completed
If the engineer cannot complete the installation (for example due to access issues or blocked ducts), a follow-up visit may be required.
4. Router delivery
We send a pre-configured router:
- Usually before or on the activation day
- It can be sent to an alternative address if you have not yet moved in
Once received, connect the router when your service is live.
5. Activation and testing
After installation:
- Vfast GPON services are tested by the engineer on site
- Other networks usually go live the same day or the next working day
Connect your router and check that your connection is working.
6. After installation
Once connected, you can start using your service.
If there are any problems, contact the Vfast Service Desk for support.
Need help?
We’re here every step of the way.
- Call us on 0330 324 0324
- Or reply to any of our emails
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article